An acceptance test is the fire authority’s inspector watching the system do what the approved plans say it should. What gets tested, who has to witness it and what has to be corrected before sign-off are that authority’s decision.
Before the day, the system is pretested and anything that does not work is corrected. On the day, Moro Cojo is there to operate the system for the inspector, with the documentation the office asked for. After it, any correction the inspector asks for is made, and a retest is arranged if the office wants one.